ASH-CGES Management Inc.

CORPORATE / commercial

sovereign group INCUBATOR SPACE, MANAMA – BAHRAIN

 AL KHAIR TOWERS 6,000ft2
(July  2025)

“A full range of Preliminary Design & Conceptual Sketches. ASH-CGES was tasked to convert two conventional offices into a trendy incubator space . The main features of the concept were advanced control systems, flexibility of space arrangement and compliance with applicable codes. 

MANDEENA, THE AVENUES MALL – KINGDOM OF BAHRAIN

 New Food Court Unit    7,000 ft2
(June  2022)

“ Architecture concept and detailed design. We were tasked to undertake( develop & manage) a recent Food & beverage brand at one of the high-end popular malls owned by AlShaya. 

SUPERMARKET, AMWAJ – KINGDOM OF BAHRAIN

 New Hypermarket    35,000 ft2
(March 2022)

“Architecture concept. We were tasked to undertake( develop & manage) site due diligence, design brief, test fits plan, scheme design and apply for zoning change to amend the use of two lots of land. The project includes customer parking in the basement, customer area / delivery in the main floor in addition to 5000 ft 2 offices in the mezzanine 

TAILORING HOUSE, MANAMA – KINGDOM OF BAHRAIN

 Well Established Tailoring House   9,000 ft2
(February 2022)

“Architecture concept. We were tasked to undertake( develop & manage) site due diligence, design brief, test fits plan, scheme design. 

COMMERCIAL PLAZA, ALHAJAR – KINGDOM OF BAHRAIN

 ALHAJA Plaza  39,470ft2
(December 2021)

“Architecture concept & detailed design. We were tasked to undertake( develop & manage) site due diligence, design brief, test fits plan, scheme design and detailed execution drawings. The design brief of the project was altered at a later stage”

COWORKING SPACE, CAIRO – EGYPT

 Zamalek Office building 2,400ft2
(August 2021)

“A full range of Preliminary Design & Conceptual Sketches. ASH-CGES was tasked to convert a conventional office floor into a trendy coworking space . The main features of the concept were advanced control systems and maximum flexibility of space arrangement. 

CISCO SYSTEMS INTERNATIONAL, Dubai – UAE

Cisco Systems Office building 9000m2
(February 2008 – June 2010)

“A full range of Project & Cost Management services provided to Cisco Systems International. As a lead project manager, ASH-CGES was tasked to manage a challenging relocation project. The scope extended to include a full Project, Cost and Move management services. ASH-CGES showed long-standing commitment to the project, have enabled the new hub to be successfully occupied despite multiple changes in the brief over the 2 year journey and have driven the integration of the CRE Connected Real Estate into the controls of this complex building located in Knowledge Village, Dubai, United Arab Emirates”

CISCO SYSTEMS INTERNATIONAL, Abu Dhabi - UAE

Cisco Systems New Office 340m2
(February 2008 – November 2008)

“Architecture, MEP, Interior design and Project Management services produced for Cisco Systems International. As general consultant, ASH-CGES was tasked to undertake( develop & manage) site due diligence, design brief, test fits plan, scheme design, detailed execution drawings and full tendering documents of the new office in Al Batin Complex Abu Dhabi, United Arab Emirates. The design brief of the project was altered at a later stage”

CISCO SYSTEMS INTERNATIONAL, Riyadh - KSA

Cisco Systems Office, Tele-presence Room TP3200
(November 2008 – March 2009)

“Architecture, MEP, Interior design and full range of Project Management services produced for Cisco Systems International. As general consultant, ASH-CGES was tasked to undertake( develop & manage) test fits plan, scheme design, detailed execution drawings, tendering documents, construction management services & successful RRA Room Readiness Assessment.”

CISCO SYSTEMS INTERNATIONAL, Doha - Qatar

Qatar Science & Technology Park – Cisco Systems New Offices 1500m2
(November 2008 – February 2009)

“Architecture, MEP, Interior design and full range of Project & Cost Management services produced for Cisco Systems International. As general consultant, ASH-CGES was tasked to undertake( develop & manage) site due diligence, design brief, test fits plan, scheme design, detailed execution drawings, tendering documents, construction management services & successful move in. The project was located in Qatar Foundation landmark complex, Qatar Science & Technology Park – Doha, Qatar”

CISCO SYSTEMS INTERNATIONAL, Cairo - Egypt

Cisco Systems Office Expansion 1500m2
(June 2006 – March 2007)

“MEP design and Project & Cost Management services produced for Cisco Systems International. ASH-CGES was tasked to undertake (develop & manage) detailed MEP execution drawings and full range of project management services of the new office expansion in Cist Star Office Complex Cairo, Egypt”

MAPSO – HILTY headquarter, Cairo - Egypt

HILTY, Office building 4000m2
(November 1999 – November 2000)

“Architecture & adaptive interior design, project and cost management services produced for HILTI. This design examined post modern alternatives within an existing industrial structure. The intervention of new reception hall, public gallery, staff entrances and modern showroom were designed with great deal of simplicity & originality.”

BRITISH GAS, Complex in Cairo - Egypt

BRITISH GAS, Office building and conference complex 6000m2
(January 1999 – December 1999)

“Architecture design and total interiors re-modeling produced for BG. The five-floor building was a residential apartment building that had an annexed conference center. The new design examined various layouts & floor arrangements within the fabric of an existing concrete structure. There was a need for essential structural alterations to form wide span spaces and open plan solutions.”